  {"task_id":"T04001","project":"Website Redesign","task_name":"Build prototype","assignee":"Aisha Torres","priority":"Medium","status":"Blocked","start_date":"2024-05-27","due_date":"2024-06-03","completed_date":null,"estimated_hours":4,"actual_hours":2.8,"percent_complete":65},
  {"task_id":"T04002","project":"Website Redesign","task_name":"Stakeholder update","assignee":"Aisha Torres","priority":"Medium","status":"Done","start_date":"2024-09-22","due_date":"2024-09-25","completed_date":"2024-09-30","estimated_hours":4,"actual_hours":4,"percent_complete":100},
  {"task_id":"T04003","project":"Website Redesign","task_name":"Fix defects","assignee":"James Wright","priority":"Low","status":"Done","start_date":"2024-03-06","due_date":"2024-03-07","completed_date":"2024-03-07","estimated_hours":2,"actual_hours":2,"percent_complete":100},
  {"task_id":"T04004","project":"Website Redesign","task_name":"Build prototype","assignee":"Aisha Torres","priority":"Medium","status":"Done","start_date":"2024-12-01","due_date":"2024-12-17","completed_date":"2024-12-29","estimated_hours":40,"actual_hours":37.8,"percent_complete":100},
  {"task_id":"T04005","project":"Website Redesign","task_name":"Kickoff meeting","assignee":"James Wright","priority":"High","status":"Done","start_date":"2024-08-14","due_date":"2024-08-29","completed_date":"2024-08-31","estimated_hours":60,"actual_hours":75.2,"percent_complete":100},
  {"task_id":"T04006","project":"Website Redesign","task_name":"Fix defects","assignee":"Andrew Kim","priority":"Medium","status":"Done","start_date":"2024-03-14","due_date":"2024-03-25","completed_date":"2024-03-25","estimated_hours":40,"actual_hours":38.7,"percent_complete":100},
  {"task_id":"T04007","project":"Website Redesign","task_name":"Build prototype","assignee":"James Wright","priority":"Low","status":"Done","start_date":"2024-11-07","due_date":"2024-11-13","completed_date":"2024-11-15","estimated_hours":8,"actual_hours":6,"percent_complete":100},
  {"task_id":"T04008","project":"Website Redesign","task_name":"Draft specification","assignee":"Jonathan Morgan","priority":"Low","status":"Done","start_date":"2024-08-20","due_date":"2024-08-31","completed_date":"2024-09-02","estimated_hours":40,"actual_hours":41.4,"percent_complete":100},
  {"task_id":"T04009","project":"Website Redesign","task_name":"Kickoff meeting","assignee":"Aisha Torres","priority":"High","status":"Done","start_date":"2024-04-24","due_date":"2024-05-03","completed_date":"2024-05-02","estimated_hours":8,"actual_hours":5.8,"percent_complete":100},
  {"task_id":"T04010","project":"Website Redesign","task_name":"Data migration","assignee":"Andrew Kim","priority":"Critical","status":"Done","start_date":"2024-05-14","due_date":"2024-06-03","completed_date":"2024-05-31","estimated_hours":40,"actual_hours":38.3,"percent_complete":100},
  {"task_id":"T04011","project":"Website Redesign","task_name":"Design mockups","assignee":"Andrew Kim","priority":"Medium","status":"Done","start_date":"2024-06-26","due_date":"2024-07-02","completed_date":"2024-07-01","estimated_hours":8,"actual_hours":10.8,"percent_complete":100},
  {"task_id":"T04012","project":"Website Redesign","task_name":"Documentation","assignee":"James Wright","priority":"Low","status":"Done","start_date":"2024-06-18","due_date":"2024-06-21","completed_date":"2024-06-21","estimated_hours":8,"actual_hours":7.4,"percent_complete":100},
  {"task_id":"T04013","project":"Website Redesign","task_name":"Kickoff meeting","assignee":"Aisha Torres","priority":"Medium","status":"Done","start_date":"2024-10-20","due_date":"2024-11-08","completed_date":"2024-11-08","estimated_hours":40,"actual_hours":33.6,"percent_complete":100},
  {"task_id":"T04014","project":"Website Redesign","task_name":"Training materials","assignee":"Aisha Torres","priority":"Medium","status":"Done","start_date":"2024-08-05","due_date":"2024-08-21","completed_date":"2024-08-21","estimated_hours":40,"actual_hours":29.9,"percent_complete":100},
  {"task_id":"T04015","project":"Website Redesign","task_name":"Documentation","assignee":"Andrew Kim","priority":"Low","status":"Done","start_date":"2024-05-03","due_date":"2024-05-27","completed_date":"2024-05-27","estimated_hours":60,"actual_hours":89,"percent_complete":100},
  {"task_id":"T04016","project":"Website Redesign","task_name":"Kickoff meeting","assignee":"Ashley Mitchell","priority":"Medium","status":"Done","start_date":"2024-04-29","due_date":"2024-05-18","completed_date":"2024-05-15","estimated_hours":60,"actual_hours":85.1,"percent_complete":100},
  {"task_id":"T04017","project":"Website Redesign","task_name":"Fix defects","assignee":"Ashley Mitchell","priority":"Medium","status":"Blocked","start_date":"2024-06-17","due_date":"2024-06-23","completed_date":null,"estimated_hours":16,"actual_hours":3.9,"percent_complete":20},
  {"task_id":"T04018","project":"Website Redesign","task_name":"Draft specification","assignee":"Aisha Torres","priority":"Low","status":"Done","start_date":"2024-03-02","due_date":"2024-03-09","completed_date":"2024-03-08","estimated_hours":24,"actual_hours":30.3,"percent_complete":100},
  {"task_id":"T04019","project":"Website Redesign","task_name":"User testing","assignee":"Ashley Mitchell","priority":"Medium","status":"Done","start_date":"2024-03-16","due_date":"2024-03-29","completed_date":"2024-03-26","estimated_hours":16,"actual_hours":16.2,"percent_complete":100},
  {"task_id":"T04020","project":"Website Redesign","task_name":"Stakeholder update","assignee":"Ashley Mitchell","priority":"Medium","status":"Done","start_date":"2024-05-14","due_date":"2024-05-22","completed_date":"2024-06-03","estimated_hours":8,"actual_hours":7.7,"percent_complete":100},
  {"task_id":"T04021","project":"Website Redesign","task_name":"Training materials","assignee":"Andrew Kim","priority":"High","status":"In progress","start_date":"2024-10-29","due_date":"2024-11-08","completed_date":null,"estimated_hours":8,"actual_hours":2.1,"percent_complete":30},
  {"task_id":"T04022","project":"Website Redesign","task_name":"Data migration","assignee":"Ashley Mitchell","priority":"Medium","status":"Done","start_date":"2024-05-24","due_date":"2024-06-05","completed_date":"2024-06-07","estimated_hours":8,"actual_hours":7.2,"percent_complete":100},
  {"task_id":"T04023","project":"Website Redesign","task_name":"Fix defects","assignee":"Jonathan Morgan","priority":"High","status":"Done","start_date":"2024-02-07","due_date":"2024-02-11","completed_date":"2024-02-11","estimated_hours":16,"actual_hours":19.1,"percent_complete":100},
  {"task_id":"T04024","project":"Website Redesign","task_name":"Data migration","assignee":"Jonathan Morgan","priority":"Critical","status":"Done","start_date":"2024-11-19","due_date":"2024-11-25","completed_date":"2024-11-25","estimated_hours":4,"actual_hours":3.2,"percent_complete":100},
  {"task_id":"T04025","project":"Website Redesign","task_name":"Kickoff meeting","assignee":"Aisha Torres","priority":"Low","status":"Done","start_date":"2024-04-20","due_date":"2024-05-06","completed_date":"2024-05-08","estimated_hours":24,"actual_hours":19.4,"percent_complete":100},
  {"task_id":"T04026","project":"Mobile App Launch","task_name":"Stakeholder update","assignee":"Barbara Chen","priority":"High","status":"In progress","start_date":"2024-06-02","due_date":"2024-06-08","completed_date":null,"estimated_hours":24,"actual_hours":11.7,"percent_complete":45},
  {"task_id":"T04027","project":"Mobile App Launch","task_name":"Go-live checklist","assignee":"Barbara Chen","priority":"High","status":"Done","start_date":"2024-08-30","due_date":"2024-09-04","completed_date":"2024-09-09","estimated_hours":4,"actual_hours":5.3,"percent_complete":100},
  {"task_id":"T04028","project":"Mobile App Launch","task_name":"Vendor review","assignee":"Omar Miller","priority":"High","status":"Done","start_date":"2024-05-15","due_date":"2024-05-29","completed_date":"2024-05-31","estimated_hours":24,"actual_hours":35.4,"percent_complete":100},
  {"task_id":"T04029","project":"Mobile App Launch","task_name":"Write test plan","assignee":"Laura Perez","priority":"Medium","status":"In progress","start_date":"2024-05-01","due_date":"2024-05-07","completed_date":null,"estimated_hours":4,"actual_hours":1.7,"percent_complete":42},
  {"task_id":"T04030","project":"Mobile App Launch","task_name":"Data migration","assignee":"Laura Perez","priority":"Low","status":"Done","start_date":"2024-10-05","due_date":"2024-10-09","completed_date":"2024-10-08","estimated_hours":8,"actual_hours":8.1,"percent_complete":100},
  {"task_id":"T04031","project":"Mobile App Launch","task_name":"Stakeholder update","assignee":"Barbara King","priority":"Low","status":"Done","start_date":"2024-06-08","due_date":"2024-06-22","completed_date":"2024-06-19","estimated_hours":16,"actual_hours":16.6,"percent_complete":100},
  {"task_id":"T04032","project":"Mobile App Launch","task_name":"Documentation","assignee":"Omar Miller","priority":"Medium","status":"Done","start_date":"2024-05-23","due_date":"2024-06-05","completed_date":"2024-06-05","estimated_hours":16,"actual_hours":14.6,"percent_complete":100},
  {"task_id":"T04033","project":"Mobile App Launch","task_name":"Budget approval","assignee":"Laura Perez","priority":"Medium","status":"Done","start_date":"2024-11-15","due_date":"2024-11-16","completed_date":"2024-11-16","estimated_hours":2,"actual_hours":2.7,"percent_complete":100},
  {"task_id":"T04034","project":"Mobile App Launch","task_name":"Vendor review","assignee":"Barbara Chen","priority":"Medium","status":"Done","start_date":"2024-04-18","due_date":"2024-04-25","completed_date":"2024-04-24","estimated_hours":8,"actual_hours":6.7,"percent_complete":100},
  {"task_id":"T04035","project":"Mobile App Launch","task_name":"Vendor review","assignee":"Omar Miller","priority":"High","status":"Done","start_date":"2024-07-05","due_date":"2024-07-16","completed_date":"2024-07-21","estimated_hours":8,"actual_hours":9,"percent_complete":100},
  {"task_id":"T04036","project":"Mobile App Launch","task_name":"Go-live checklist","assignee":"Laura Mitchell","priority":"Low","status":"In progress","start_date":"2024-04-04","due_date":"2024-04-12","completed_date":null,"estimated_hours":16,"actual_hours":5,"percent_complete":27},
  {"task_id":"T04037","project":"Mobile App Launch","task_name":"Data migration","assignee":"Laura Perez","priority":"High","status":"Done","start_date":"2024-03-20","due_date":"2024-03-29","completed_date":"2024-03-29","estimated_hours":8,"actual_hours":10.7,"percent_complete":100},
  {"task_id":"T04038","project":"Mobile App Launch","task_name":"Stakeholder update","assignee":"Omar Miller","priority":"Medium","status":"Done","start_date":"2024-11-19","due_date":"2024-11-27","completed_date":"2024-11-26","estimated_hours":24,"actual_hours":17.3,"percent_complete":100},
  {"task_id":"T04039","project":"Mobile App Launch","task_name":"Documentation","assignee":"Laura Mitchell","priority":"Medium","status":"Done","start_date":"2024-07-26","due_date":"2024-08-02","completed_date":"2024-08-01","estimated_hours":16,"actual_hours":16.1,"percent_complete":100},
  {"task_id":"T04040","project":"Mobile App Launch","task_name":"Fix defects","assignee":"Omar Miller","priority":"Medium","status":"Done","start_date":"2024-09-01","due_date":"2024-09-17","completed_date":"2024-09-22","estimated_hours":40,"actual_hours":30.7,"percent_complete":100},
  {"task_id":"T04041","project":"Mobile App Launch","task_name":"Budget approval","assignee":"Omar Miller","priority":"Low","status":"In progress","start_date":"2024-07-25","due_date":"2024-08-08","completed_date":null,"estimated_hours":24,"actual_hours":18.4,"percent_complete":83},
  {"task_id":"T04042","project":"Mobile App Launch","task_name":"Requirements review","assignee":"Barbara Chen","priority":"Medium","status":"Done","start_date":"2024-03-30","due_date":"2024-04-03","completed_date":"2024-04-02","estimated_hours":8,"actual_hours":7.8,"percent_complete":100},
  {"task_id":"T04043","project":"Mobile App Launch","task_name":"Go-live checklist","assignee":"Barbara Chen","priority":"High","status":"Done","start_date":"2024-05-25","due_date":"2024-06-09","completed_date":"2024-06-11","estimated_hours":40,"actual_hours":32.7,"percent_complete":100},
  {"task_id":"T04044","project":"Mobile App Launch","task_name":"Stakeholder update","assignee":"Laura Mitchell","priority":"High","status":"Done","start_date":"2024-04-27","due_date":"2024-05-06","completed_date":"2024-05-08","estimated_hours":4,"actual_hours":4.5,"percent_complete":100},
  {"task_id":"T04045","project":"Mobile App Launch","task_name":"Go-live checklist","assignee":"Laura Mitchell","priority":"Medium","status":"Done","start_date":"2024-10-01","due_date":"2024-10-15","completed_date":"2024-10-15","estimated_hours":16,"actual_hours":19.8,"percent_complete":100},
  {"task_id":"T04046","project":"Mobile App Launch","task_name":"User testing","assignee":"Laura Perez","priority":"Medium","status":"Done","start_date":"2024-10-05","due_date":"2024-10-16","completed_date":"2024-10-18","estimated_hours":16,"actual_hours":15.8,"percent_complete":100},
  {"task_id":"T04047","project":"Mobile App Launch","task_name":"Budget approval","assignee":"Barbara King","priority":"Medium","status":"Done","start_date":"2024-10-26","due_date":"2024-11-02","completed_date":"2024-11-04","estimated_hours":8,"actual_hours":9.4,"percent_complete":100},
  {"task_id":"T04048","project":"Mobile App Launch","task_name":"Kickoff meeting","assignee":"Barbara King","priority":"Medium","status":"Done","start_date":"2024-09-22","due_date":"2024-09-26","completed_date":"2024-09-26","estimated_hours":4,"actual_hours":4.6,"percent_complete":100},
  {"task_id":"T04049","project":"Mobile App Launch","task_name":"Go-live checklist","assignee":"Barbara Chen","priority":"Low","status":"Done","start_date":"2024-02-12","due_date":"2024-02-20","completed_date":"2024-02-19","estimated_hours":16,"actual_hours":12.5,"percent_complete":100},
  {"task_id":"T04050","project":"Mobile App Launch","task_name":"Draft specification","assignee":"Laura Perez","priority":"Medium","status":"Done","start_date":"2024-09-01","due_date":"2024-09-18","completed_date":"2024-09-17","estimated_hours":40,"actual_hours":32.6,"percent_complete":100},
  {"task_id":"T04051","project":"CRM Migration","task_name":"Stakeholder update","assignee":"Eric Lewis","priority":"High","status":"Done","start_date":"2024-05-03","due_date":"2024-05-09","completed_date":"2024-05-08","estimated_hours":4,"actual_hours":3.9,"percent_complete":100},
  {"task_id":"T04052","project":"CRM Migration","task_name":"Draft specification","assignee":"Michelle Wright","priority":"High","status":"Done","start_date":"2024-02-29","due_date":"2024-03-12","completed_date":"2024-03-12","estimated_hours":24,"actual_hours":23,"percent_complete":100},
  {"task_id":"T04053","project":"CRM Migration","task_name":"Training materials","assignee":"Eric Lewis","priority":"Medium","status":"Blocked","start_date":"2024-07-24","due_date":"2024-08-06","completed_date":null,"estimated_hours":24,"actual_hours":13.3,"percent_complete":52},
  {"task_id":"T04054","project":"CRM Migration","task_name":"Training materials","assignee":"Eric Lewis","priority":"Medium","status":"In progress","start_date":"2024-08-12","due_date":"2024-08-20","completed_date":null,"estimated_hours":16,"actual_hours":17.8,"percent_complete":90},
  {"task_id":"T04055","project":"CRM Migration","task_name":"Draft specification","assignee":"Eric Lewis","priority":"Medium","status":"Done","start_date":"2024-08-10","due_date":"2024-08-20","completed_date":"2024-08-25","estimated_hours":16,"actual_hours":19.3,"percent_complete":100},
  {"task_id":"T04056","project":"CRM Migration","task_name":"Documentation","assignee":"Eric Lewis","priority":"Critical","status":"Done","start_date":"2024-10-05","due_date":"2024-10-11","completed_date":"2024-10-10","estimated_hours":8,"actual_hours":11.9,"percent_complete":100},
  {"task_id":"T04057","project":"CRM Migration","task_name":"Stakeholder update","assignee":"Susan Bell","priority":"Low","status":"Done","start_date":"2024-01-13","due_date":"2024-01-29","completed_date":"2024-01-29","estimated_hours":60,"actual_hours":81.8,"percent_complete":100},
  {"task_id":"T04058","project":"CRM Migration","task_name":"Documentation","assignee":"Mary Cook","priority":"Critical","status":"Done","start_date":"2024-02-09","due_date":"2024-02-12","completed_date":"2024-02-11","estimated_hours":8,"actual_hours":9.7,"percent_complete":100},
  {"task_id":"T04059","project":"CRM Migration","task_name":"Vendor review","assignee":"Michelle Wright","priority":"Low","status":"Done","start_date":"2024-01-15","due_date":"2024-01-26","completed_date":"2024-01-23","estimated_hours":24,"actual_hours":18,"percent_complete":100},
  {"task_id":"T04060","project":"CRM Migration","task_name":"Documentation","assignee":"Mary Cook","priority":"Critical","status":"Done","start_date":"2024-07-10","due_date":"2024-07-25","completed_date":"2024-07-22","estimated_hours":24,"actual_hours":25.7,"percent_complete":100},
  {"task_id":"T04061","project":"CRM Migration","task_name":"Kickoff meeting","assignee":"Susan Bell","priority":"Medium","status":"Done","start_date":"2024-01-16","due_date":"2024-01-30","completed_date":"2024-01-30","estimated_hours":16,"actual_hours":19.1,"percent_complete":100},
  {"task_id":"T04062","project":"CRM Migration","task_name":"Data migration","assignee":"Susan Bell","priority":"Low","status":"Done","start_date":"2024-08-20","due_date":"2024-09-09","completed_date":"2024-09-11","estimated_hours":60,"actual_hours":53.5,"percent_complete":100},
  {"task_id":"T04063","project":"CRM Migration","task_name":"Go-live checklist","assignee":"David Hernandez","priority":"High","status":"Done","start_date":"2024-11-20","due_date":"2024-11-22","completed_date":"2024-11-22","estimated_hours":4,"actual_hours":4.1,"percent_complete":100},
  {"task_id":"T04064","project":"CRM Migration","task_name":"Documentation","assignee":"Eric Lewis","priority":"Medium","status":"Done","start_date":"2024-07-04","due_date":"2024-07-22","completed_date":"2024-07-21","estimated_hours":40,"actual_hours":46.4,"percent_complete":100},
  {"task_id":"T04065","project":"CRM Migration","task_name":"Design mockups","assignee":"Susan Bell","priority":"Medium","status":"Done","start_date":"2024-07-18","due_date":"2024-07-28","completed_date":"2024-07-27","estimated_hours":2,"actual_hours":2.3,"percent_complete":100},
  {"task_id":"T04066","project":"CRM Migration","task_name":"Vendor review","assignee":"David Hernandez","priority":"Medium","status":"Done","start_date":"2024-11-21","due_date":"2024-11-28","completed_date":"2024-11-30","estimated_hours":16,"actual_hours":20.1,"percent_complete":100},
  {"task_id":"T04067","project":"CRM Migration","task_name":"Design mockups","assignee":"Susan Bell","priority":"High","status":"Done","start_date":"2024-07-20","due_date":"2024-07-29","completed_date":"2024-07-28","estimated_hours":4,"actual_hours":3.3,"percent_complete":100},
  {"task_id":"T04068","project":"CRM Migration","task_name":"Data migration","assignee":"Mary Cook","priority":"High","status":"Blocked","start_date":"2024-08-07","due_date":"2024-08-14","completed_date":null,"estimated_hours":16,"actual_hours":11.5,"percent_complete":75},
  {"task_id":"T04069","project":"CRM Migration","task_name":"Design mockups","assignee":"Eric Lewis","priority":"High","status":"Done","start_date":"2024-10-23","due_date":"2024-11-08","completed_date":"2024-11-13","estimated_hours":60,"actual_hours":63.7,"percent_complete":100},
  {"task_id":"T04070","project":"CRM Migration","task_name":"Write test plan","assignee":"Mary Cook","priority":"Critical","status":"Done","start_date":"2024-03-16","due_date":"2024-04-01","completed_date":"2024-04-01","estimated_hours":24,"actual_hours":18.5,"percent_complete":100},
  {"task_id":"T04071","project":"CRM Migration","task_name":"User testing","assignee":"Eric Lewis","priority":"Medium","status":"Done","start_date":"2024-09-26","due_date":"2024-10-10","completed_date":"2024-10-10","estimated_hours":16,"actual_hours":13.8,"percent_complete":100},
  {"task_id":"T04072","project":"CRM Migration","task_name":"Fix defects","assignee":"Michelle Wright","priority":"Critical","status":"Done","start_date":"2024-03-17","due_date":"2024-03-28","completed_date":"2024-03-28","estimated_hours":8,"actual_hours":9.8,"percent_complete":100},
  {"task_id":"T04073","project":"CRM Migration","task_name":"Documentation","assignee":"Eric Lewis","priority":"Low","status":"Done","start_date":"2024-08-14","due_date":"2024-08-29","completed_date":"2024-08-26","estimated_hours":24,"actual_hours":23.3,"percent_complete":100},
  {"task_id":"T04074","project":"CRM Migration","task_name":"Fix defects","assignee":"Mary Cook","priority":"Low","status":"Done","start_date":"2024-06-20","due_date":"2024-07-01","completed_date":"2024-07-03","estimated_hours":8,"actual_hours":11,"percent_complete":100},
  {"task_id":"T04075","project":"CRM Migration","task_name":"Go-live checklist","assignee":"David Hernandez","priority":"Low","status":"Done","start_date":"2024-09-12","due_date":"2024-10-01","completed_date":"2024-10-01","estimated_hours":40,"actual_hours":42.5,"percent_complete":100},
  {"task_id":"T04076","project":"Warehouse Expansion","task_name":"Budget approval","assignee":"Nancy Thomas","priority":"Medium","status":"Done","start_date":"2024-09-01","due_date":"2024-09-13","completed_date":"2024-09-18","estimated_hours":16,"actual_hours":13.4,"percent_complete":100},
  {"task_id":"T04077","project":"Warehouse Expansion","task_name":"Training materials","assignee":"Joshua Patel","priority":"Critical","status":"Done","start_date":"2024-04-24","due_date":"2024-05-15","completed_date":"2024-05-27","estimated_hours":60,"actual_hours":50.9,"percent_complete":100},
  {"task_id":"T04078","project":"Warehouse Expansion","task_name":"User testing","assignee":"Nancy Thomas","priority":"Medium","status":"In progress","start_date":"2024-04-02","due_date":"2024-04-05","completed_date":null,"estimated_hours":2,"actual_hours":1.3,"percent_complete":64},
  {"task_id":"T04079","project":"Warehouse Expansion","task_name":"Build prototype","assignee":"Joseph Johnson","priority":"Medium","status":"Done","start_date":"2024-03-01","due_date":"2024-03-21","completed_date":"2024-03-21","estimated_hours":60,"actual_hours":74.4,"percent_complete":100},
  {"task_id":"T04080","project":"Warehouse Expansion","task_name":"Requirements review","assignee":"Joseph Johnson","priority":"Low","status":"Done","start_date":"2024-03-30","due_date":"2024-04-11","completed_date":"2024-04-16","estimated_hours":16,"actual_hours":14.9,"percent_complete":100},
  {"task_id":"T04081","project":"Warehouse Expansion","task_name":"Vendor review","assignee":"Nancy Thomas","priority":"High","status":"Done","start_date":"2024-10-22","due_date":"2024-10-29","completed_date":"2024-10-29","estimated_hours":16,"actual_hours":22.5,"percent_complete":100},
  {"task_id":"T04082","project":"Warehouse Expansion","task_name":"Write test plan","assignee":"Melissa Shah","priority":"Low","status":"Done","start_date":"2024-05-17","due_date":"2024-05-24","completed_date":"2024-05-29","estimated_hours":16,"actual_hours":11.4,"percent_complete":100},
  {"task_id":"T04083","project":"Warehouse Expansion","task_name":"Budget approval","assignee":"Joseph Johnson","priority":"Medium","status":"Blocked","start_date":"2024-01-26","due_date":"2024-02-02","completed_date":null,"estimated_hours":8,"actual_hours":6.6,"percent_complete":59},
  {"task_id":"T04084","project":"Warehouse Expansion","task_name":"User testing","assignee":"Melissa Shah","priority":"High","status":"Done","start_date":"2024-08-03","due_date":"2024-08-17","completed_date":"2024-08-19","estimated_hours":40,"actual_hours":34.6,"percent_complete":100},
  {"task_id":"T04085","project":"Warehouse Expansion","task_name":"Documentation","assignee":"Melissa Shah","priority":"Medium","status":"Done","start_date":"2024-01-23","due_date":"2024-02-07","completed_date":"2024-02-09","estimated_hours":24,"actual_hours":22.2,"percent_complete":100},
  {"task_id":"T04086","project":"Warehouse Expansion","task_name":"User testing","assignee":"Melissa Shah","priority":"Medium","status":"Done","start_date":"2024-05-05","due_date":"2024-05-10","completed_date":"2024-05-10","estimated_hours":16,"actual_hours":18,"percent_complete":100},
  {"task_id":"T04087","project":"Warehouse Expansion","task_name":"Stakeholder update","assignee":"Melissa Shah","priority":"Medium","status":"Blocked","start_date":"2024-04-01","due_date":"2024-04-10","completed_date":null,"estimated_hours":4,"actual_hours":1.6,"percent_complete":38},
  {"task_id":"T04088","project":"Warehouse Expansion","task_name":"Data migration","assignee":"Melissa Shah","priority":"Low","status":"Done","start_date":"2024-08-21","due_date":"2024-09-02","completed_date":"2024-09-01","estimated_hours":8,"actual_hours":9.9,"percent_complete":100},
  {"task_id":"T04089","project":"Warehouse Expansion","task_name":"Fix defects","assignee":"Nancy Thomas","priority":"Critical","status":"Done","start_date":"2024-09-15","due_date":"2024-09-27","completed_date":"2024-09-27","estimated_hours":16,"actual_hours":22.9,"percent_complete":100},
  {"task_id":"T04090","project":"Warehouse Expansion","task_name":"Build prototype","assignee":"Joseph Johnson","priority":"Low","status":"Done","start_date":"2024-05-01","due_date":"2024-05-10","completed_date":"2024-05-07","estimated_hours":4,"actual_hours":4.7,"percent_complete":100},
  {"task_id":"T04091","project":"Warehouse Expansion","task_name":"Go-live checklist","assignee":"Melissa Shah","priority":"High","status":"Done","start_date":"2024-09-30","due_date":"2024-10-14","completed_date":"2024-10-13","estimated_hours":16,"actual_hours":15.3,"percent_complete":100},
  {"task_id":"T04092","project":"Warehouse Expansion","task_name":"Fix defects","assignee":"Nancy Thomas","priority":"High","status":"Done","start_date":"2024-07-14","due_date":"2024-07-28","completed_date":"2024-07-30","estimated_hours":16,"actual_hours":14.5,"percent_complete":100},
  {"task_id":"T04093","project":"Warehouse Expansion","task_name":"Write test plan","assignee":"Joseph Johnson","priority":"Medium","status":"Done","start_date":"2024-04-21","due_date":"2024-05-05","completed_date":"2024-05-05","estimated_hours":24,"actual_hours":30,"percent_complete":100},
  {"task_id":"T04094","project":"Warehouse Expansion","task_name":"Go-live checklist","assignee":"Joshua Patel","priority":"High","status":"Done","start_date":"2024-03-05","due_date":"2024-03-12","completed_date":"2024-03-09","estimated_hours":24,"actual_hours":26.5,"percent_complete":100},
  {"task_id":"T04095","project":"Warehouse Expansion","task_name":"Requirements review","assignee":"Joshua Patel","priority":"Medium","status":"Done","start_date":"2024-10-10","due_date":"2024-10-23","completed_date":"2024-10-28","estimated_hours":16,"actual_hours":14.7,"percent_complete":100},
  {"task_id":"T04096","project":"Warehouse Expansion","task_name":"Kickoff meeting","assignee":"Nancy Thomas","priority":"High","status":"Done","start_date":"2024-11-17","due_date":"2024-11-28","completed_date":"2024-11-27","estimated_hours":8,"actual_hours":8.7,"percent_complete":100},
  {"task_id":"T04097","project":"Warehouse Expansion","task_name":"Requirements review","assignee":"Michael Ramirez","priority":"High","status":"Done","start_date":"2024-07-31","due_date":"2024-08-13","completed_date":"2024-08-15","estimated_hours":16,"actual_hours":21.8,"percent_complete":100},
  {"task_id":"T04098","project":"Warehouse Expansion","task_name":"Vendor review","assignee":"Joshua Patel","priority":"Low","status":"Done","start_date":"2024-05-26","due_date":"2024-06-01","completed_date":"2024-06-03","estimated_hours":16,"actual_hours":13.7,"percent_complete":100},
  {"task_id":"T04099","project":"Warehouse Expansion","task_name":"Budget approval","assignee":"Michael Ramirez","priority":"Low","status":"Done","start_date":"2024-02-23","due_date":"2024-02-25","completed_date":"2024-02-27","estimated_hours":4,"actual_hours":4.3,"percent_complete":100},
  {"task_id":"T04100","project":"Warehouse Expansion","task_name":"Write test plan","assignee":"Joshua Patel","priority":"Medium","status":"Done","start_date":"2024-10-24","due_date":"2024-10-30","completed_date":"2024-10-29","estimated_hours":16,"actual_hours":19.1,"percent_complete":100}
]